Evansville, IN December 2024

Evansville, IN December 2024

Evansville-December-2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Location, Bore under Lloyd Expressway at 116′ was critical due to grade requirements for proper drainage. Winter weather and flooding conditions posed...
Martinsville, IN November 2024

Martinsville, IN November 2024

Martinsville-November-2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Bored beneath Highway 39 with grade critical for gravity sewer installation, requiring precise alignment to connect seamlessly to the existing line. VIEW...
Bargersville, IN November 2024

Bargersville, IN November 2024

Bargersville-November-2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Bored 130′ beneath railway with line and grade critical for water line installation. Tight tolerances required to avoid existing utilities, compounded by...
Evansville, IN July-September 2024

Evansville, IN July-September 2024

Evansville, IN July-September 2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Water Line Project involved drilling through soapstone and sandstone rock. The depth fluctuated, and the materials varied in hardness levels. The...
Westfield, IN April 2024

Westfield, IN April 2024

Westfield, IN April 2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Gravity sewer VIEW PROJECT...