Evansville, IN July-September 2024

Distance Bored ft.

Diameter in Inches

Difficulty Scale out of 10

Project Details

Water Line Project involved drilling through soapstone and sandstone rock. The depth fluctuated, and the materials varied in hardness levels. The sandstone was very abrasive, causing heavy wear on the drilling heads. Mixed within the layers were intermittent iron ore formations.