Project Gallery
We proudly serve clients throughout Indiana, Kentucky, Illinois, and Ohio. Browse the images below to view a selection of our recently completed projects.
Charlestown, IN 2-2026
Rock bore-waterline
Seymour, IN 2-2026
Steel casing
Batesville, December 2025
Waterline for new hospital.
Pendleton, IN 12-2025
Under CSX railroad
Lebanon, October 2025
Bored 40' with a 16" diameter for casing pipe installation.
Marengo, October 2025
Bored 70' with a 2" diameter for pipe installation.
Toyota 7-2025
Special bore to bore out concrete. High pressure concrete for drainage.
Jeffersonville, September 2025
Bored 110' with a 16" diameter for casing pipe for gravity sewer. Line was critical.
Greensburg, August 2025
Bored 200' with a 16" diameter for gravity sewer installation.
Fort Wayne, IN 7-2025
Drill under Norfolk Southern Railroad
BMB 7-2025
Rods only
West Evansville, April 2025
Location, under Lloyd Expressway, bore extended 120' with grade critical for drainage. Progress was challenging due to unexpected sandstone conditions.
Jeffersonville, IN 3-2025
Bored 183' beneath wetlands with line and grade critical for gravity sewer installation. Precision was essential due to environmental sensitivity and elevation requirements.
Taylorsville, March 2025
Bored 210' beneath U.S. HWY 31 through sand and gravel soil conditions. Grade was critical with tight tolerances required around existing utilities, demanding precision and control throughout the operation.
Evansville, February 2025
Location: Under Lloyd Expressway — 191' bore with grade critical for drainage. Adverse weather, including winter storms and flooding, combined with unstable backstop soil in the ditch line, created significant challenges.
Evansville, December 2024
Location, Bore under Lloyd Expressway at 116' was critical due to grade requirements for proper drainage. Winter weather and flooding conditions posed significant challenges, impacting accessibility and progress.
Martinsville, November 2024
Bored beneath Highway 39 with grade critical for gravity sewer installation, requiring precise alignment to connect seamlessly to the existing line.
Bargersville, November 2024
Bored 130' beneath railway with line and grade critical for water line installation. Tight tolerances required to avoid existing utilities, compounded by bitter cold temperatures during execution.
Evansville, IN 7-9 2024
Total boring from 7 bores
Westfield, IN 4-2024
Gravity sewer
Cincinnati, OH 3-2024
Rocky for water
Franklin, IN 2-2024
Force Main
Noblesville, IN 10-2023
Terre Haute, IN 7-2023
Drill under GATX Rail yard
Arlington, IN 6-2023
Drill under CSX Main Rail
Newburgh, IN 4-2023
Drilling was selected as the safest and most effective method due to the required installation depth and precise alignment, as well as the proximity of the work area to an existing sewer structure and nearby residential neighborhood.
Brandenburg, KY 3-2023
174 feet of 24" rock sewer and 40 feet of 12" pipe. Limestone floaters surrounded by red clay.
Indianapolis, 2-2023
Gravity sewer line and grade critical- drilling sandy clay and rock with water veins.
Bardstown, KY 7-2022
Gravity sewerbore grade critical in limestone. Was very challenging with bore pit flooding multiple times due to being in close proximity to Rowan Creek.
Mooresville, 9-2020
Drilled pilot tubes followed by an Akkerman guide Rod Swivel (GRS50) cutting head due to tightly compacted hard clay soil conditions.