Project Gallery
We proudly serve clients throughout Indiana, Kentucky, Illinois, and Ohio. Browse the images below to view a selection of our recently completed projects.
West Evansville, April 2025
Location, under Lloyd Expressway, bore extended 120' with grade critical for drainage. Progress was challenging due to unexpected sandstone conditions.
Jeffersonville, March 2025
Bored 183' beneath wetlands with line and grade critical for gravity sewer installation. Precision was essential due to environmental sensitivity and elevation requirements.
Taylorsville, March 2025
Bored 210' beneath U.S. HWY 31 through sand and gravel soil conditions. Grade was critical with tight tolerances required around existing utilities, demanding precision and control throughout the operation.
Evansville, February 2025
Location: Under Lloyd Expressway — 191' bore with grade critical for drainage. Adverse weather, including winter storms and flooding, combined with unstable backstop soil in the ditch line, created significant challenges.
Evansville, December 2024
Location, Bore under Lloyd Expressway at 116' was critical due to grade requirements for proper drainage. Winter weather and flooding conditions posed significant challenges, impacting accessibility and progress.
Martinsville, November 2024
Bored beneath Highway 39 with grade critical for gravity sewer installation, requiring precise alignment to connect seamlessly to the existing line.
Bargersville, November 2024
Bored 130' beneath railway with line and grade critical for water line installation. Tight tolerances required to avoid existing utilities, compounded by bitter cold temperatures during execution.