West Evansville, April 2025

West Evansville, April 2025

West Evansville-April-2025 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Location, under Lloyd Expressway, bore extended 120′ with grade critical for drainage. Progress was challenging due to unexpected sandstone conditions....
Jeffersonville, March 2025

Jeffersonville, March 2025

Jeffersonville-March-2025 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Bored 183′ beneath wetlands with line and grade critical for gravity sewer installation. Precision was essential due to environmental sensitivity and...
Taylorsville, March 2025

Taylorsville, March 2025

Taylorsville-March-2025 Distance Bored ft. Diameter in Inches Difficulty scale out of 10 Project Details  Bored 210′ beneath U.S. HWY 31 through sand and gravel soil conditions. Grade was critical with tight tolerances required around existing utilities,...
Evansville, February 2025

Evansville, February 2025

Evansville-February-2025 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details  Location: Under Lloyd Expressway — 191′ bore with grade critical for drainage. Adverse weather, including winter storms and flooding, combined with...
Evansville, December 2024

Evansville, December 2024

Evansville-December-2024 Distance Bored ft. Diameter in Inches Difficulty Scale out of 10 Project Details Location, Bore under Lloyd Expressway at 116′ was critical due to grade requirements for proper drainage. Winter weather and flooding conditions posed...